Reports
2019
T17-13 Disruptions and runaways
T17-07 DT scenario extrapolation
GCU
- 2018
- D24&D25 “Handover documentation – NCBJ part. Final Report for the GCU Project”
- Additional report: “Tests of upgraded Gamma Camera in the final istallation position at JET”
- 2017
- 2016
- 2015
GSU
- 2018
- D41 “Documentation. Handover. Final Report”
- D40 “Comissioning Report”
- D30 “Report on the installation of DM2 (IPPLM, IST and JOC)
- 2016
- 2015
LRM
- 2015
- Lost Alpha Gamma Rays Monitor (LRM): D4.01 Report on detector response in DT experiments
- Lost Alpha Gamma Rays Monitor (LRM) – “Feasibility study and conceptual design for the Lost Alpha Monitor (LAM). Phase I.”